
Interior Renovations in Red Deer
Basement finishing, kitchen and bathroom remodels, flooring, trim and carpentry, painting, and whole-home renovations. The same crew and standards that build our outdoor spaces, working inside through the Alberta winter.
Green Ladder takes on interior renovations in Red Deer and Central Alberta through the winter months: kitchens, bathrooms, basements, and whole-home reworks. It is a seasonal offering that runs when outdoor work slows down, so booking ahead matters more than it does in summer.
Most interior renovations go sideways in the parts you cannot see. A basement finished over a slab that was never sealed traps moisture behind the drywall. A bathroom tiled without proper waterproofing behind the board leaks quietly for years before it shows. Trim and paint hide a lot, and a lot of contractors count on that. You see the finish. You do not see whether the framing, the vapour barrier, the plumbing rough-in, and the electrical were done to code. We build the parts you cannot see to the same standard as the parts you can.
“We hired David to do some renovations in our kitchen. He was meticulous in his work, explained the process, and completed everything in a timely manner. He always maintained a clean work environment. He is pleasant to work with and we will not hesitate to hire him for future jobs.”
Kitchens, Bathrooms, Basements
Most of the interior work we take on is one of three jobs: a kitchen, a bathroom, or a basement. We also do flooring, trim and finish carpentry, drywall and paint. Plenty of clients start with a single room and add another in a later winter, and there is no reason to do it all at once. Pick the one you are thinking about and go straight to the before and after.
Kitchen Renovations
Demolition through final fixtures. Cabinets, counters, flooring, plumbing, electrical and lighting run as one project on one schedule.
See before & after →Bathroom Remodels
Full tear-out to finish. Waterproofing behind the board and correct slope to the drain. What fails in a bathroom always fails behind the tile.
See before & after →Basement Development
Framing, insulation, vapour barrier, electrical and finishing. Egress windows, wet bars, bathrooms and separate suites are all in scope.
See before & after →Interior renovations are our winter work. The outdoor build season runs spring through fall, and we come inside once the yards freeze up, so the winter calendar fills ahead. If your kitchen or basement is a next-winter project, the conversation starts now.
The Work We Take On Inside
From a single room to a top-to-bottom transformation, this is the kind of interior work we do. You do not have to do it all at once. Book us for one kitchen, one bathroom, or the whole house. Here is a look at the before and after on a few of the spaces we have reworked.
Open-Concept Main Floor
A wall came out to open up the whole main floor. New flooring, trim, paint, and ceiling, plus replaced door and windows.
Before
AfterKitchen
Dated oak and white appliances replaced with navy cabinetry, butcher block counters, and full stainless.
Before
AfterKitchen, Sink & Range Wall
New double-oven range, farmhouse sink, and open shelving along the window wall.
Before
AfterBathroom Remodel
Refinished bright and clean with new flooring, fixtures, and a fresh tub and shower surround.
Before
AfterBathroom Remodel
Gutted to a floating wood vanity, vessel sink, gold fixtures, and a black-framed glass shower.
Before
AfterLaundry & Storage
The same space by the bathroom reworked with a barn door and open shelving.
Before
AfterBasement Development
An unfinished storage basement developed into finished, warm, fully usable living space.
Before
AfterBasement Development
Bare joists, cinder block, and clutter taken to a bright, finished basement with new stairs and flooring.
Before
AfterDining Area
Opened up and brightened, with new flooring and trim throughout.
Before
AfterPrimary Bedroom
New flooring, paint, and trim for a calm, finished feel.
Before
AfterBedroom to Home Office
A spare bedroom refinished into a bright, usable home office.
Before
AfterBreezeway
New flooring, paint, and trim turned a dark breezeway into a bright entry with patterned tile.
Before
AfterGreen Ladder builds outdoor spaces spring through fall, and we take that same crew and the same standards inside for the winter. Winter is the right time to do it: your yard is frozen anyway, our crew has the schedule to give your home real attention, and the space is finished and ready before spring. Basement development, bathroom remodels, trim and finish carpentry, painting, and full whole-home renovations across Red Deer and Central Alberta. Every project starts with an in-home consultation, a firm written proposal, and a real timeline before any demolition begins. We support you with permits, we build to code, and you get one company accountable for the whole job instead of chasing five separate trades yourself.
Basement Development
Framing, insulation, vapour barrier, electrical, and finishing. Egress windows, wet bars, bathrooms, and separate suites all within scope. Built dry and warm for Alberta winters.
Bathroom Remodels
Full tear-out to finish. Proper waterproofing behind the board, correct slope to drain, and plumbing done right the first time. The failures in a bathroom are always behind the tile.
Kitchen Renovations
We manage your full kitchen renovation from demolition to the final fixtures. Cabinets, counters, flooring, plumbing, electrical, and lighting all coordinated as one project on one schedule.
Trim & Finish Carpentry
Baseboard, casing, crown, wainscoting, built-ins, and feature walls. The finish work that makes a room feel intentional instead of builder-grade.
Drywall, Boarding & Taping
Boarding, taping, mudding, and sanding to a smooth, paint-ready finish. The flat, seamless walls that separate a real renovation from a patch job.
Interior Painting
Proper prep, clean cut lines, and durable finishes. Prep is most of the job and it is the part most people skip. We do not.
Whole-Home Renovations
Multi-room and full-house projects managed as one build with one schedule. Phased around your life so you are not living in a job site longer than you have to.
Flooring
Luxury vinyl plank, laminate, engineered hardwood, tile, linoleum, and carpet, plus full tile work for floors, showers, and backsplashes. Subfloor checked and levelled first, because flooring only ever looks as good as what is under it.
Permits & Code
We support you with the permit package and build to code on the structural, electrical, and plumbing so the work passes inspection and holds up when you sell.
Price Range
$15,000 - $150,000+
Range spans a single bathroom remodel through a full basement development or whole-home renovation. Every project is quoted firm after an in-home consultation.
Book a Design ConsultationCall (587) 447-9009Insured & WCB certified. Permit support where your build needs one.
What separates a Green Ladder build
We teach buyers what to ask, because most people don't find out what separates a strong build from a weak one until something goes wrong years later. Full structural detail reviewed at your design consultation.
Moisture managed before anything gets covered
In a basement that means checking the slab and walls and sealing before framing. In a bathroom it means a proper waterproofing membrane behind the board. Water is the thing that destroys interior work, and it is always designed in from the start.
Framing and vapour barrier built for the climate
Alberta basements need a continuous vapour barrier and insulation done correctly or you get condensation and mould inside the wall. We build the envelope to hold up, not just to look finished.
Licensed trades on plumbing and electrical
Rough-in plumbing and electrical are done by licensed trades and inspected. This is the part you never see and can never easily fix later, so it is the part we do not cut corners on.
Your kitchen managed end to end
Cabinets, counters, plumbing, electrical, and finishes sequenced as one project so everything lands in the right order. One point of contact from demolition to the final fixture.
Finish carpentry done by hand
Scribed trim, tight mitres, and level reveals. The difference between a renovation that looks custom and one that looks close is all in the finish carpentry.
One company accountable for the whole job
You are not the general contractor. We schedule the trades, sequence the work, and answer for the result. One number to call from demolition to final walkthrough.
Flooring Options for Alberta Homes
| Luxury Vinyl Plank | Laminate | Engineered Hardwood | Tile | |
|---|---|---|---|---|
| Water resistance | Waterproof | Low | Moderate | Waterproof |
| Best rooms | Anywhere, basements | Bedrooms, living | Main floors | Baths, entries |
| Cost | Low to mid | Low | High | Mid to high |
| Can refinish? | No | No | Once or twice | No |
On a cold Alberta slab we check and level the subfloor and add the right underlayment first, because flooring only performs as well as what is under it.
Further Reading
- →Basement Development in Central Alberta: A Complete Guide
- →How Much Does It Cost to Finish a Basement in Red Deer?
- →Do You Need a Permit to Finish a Basement in Alberta?
- →Adding a Basement Suite in Red Deer: What to Know
- →Basement Vapour Barrier and Moisture: What Alberta Homeowners Need to Know
- →How Much Does a Bathroom Remodel Cost in Red Deer?
Common Questions
Why do interior renovations in the winter?
It is the ideal time. Our outdoor build season across Central Alberta runs spring through fall, so winter is when we bring the crew inside and have the schedule to give your project full attention. Your yard is frozen anyway, and the interior is finished and ready to enjoy before spring. You also avoid competing with the summer rush for a good contractor.
Can you renovate my kitchen in Red Deer?
Yes. We manage your full kitchen renovation from demolition to the final fixtures: cabinets, counters, flooring, plumbing, electrical, lighting, and finishes, all coordinated as one project with one point of contact. You get a firm proposal after an in-home consultation anywhere in the Red Deer area.
Do I need a permit for a basement or bathroom renovation in Red Deer?
Usually yes. Finishing a basement, moving plumbing, or altering electrical almost always requires a permit and inspection in Red Deer and Central Alberta municipalities. We support you with the permit package and build to code so the work passes and holds up when you sell. Unpermitted renovations are a problem you inherit at resale.
How long does an interior renovation take?
A single bathroom is typically 2 to 4 weeks. A basement development runs 4 to 10 weeks depending on scope and whether it includes a bathroom or suite. Whole-home renovations are longer and phased. You get a firm timeline in your written proposal before any demolition starts.
How much does it cost to finish a basement in Red Deer?
It depends on size, whether it includes a bathroom or wet bar, and the finish level. A straightforward basement development generally starts around $35,000 and a larger build with a bathroom and separate suite runs well beyond that. We give you a firm number after an in-home consultation, not a guess over the phone.
Do you do the whole project or just part of it?
Both. We take on single-room projects like a bathroom or a basement, and we take on whole-home renovations across Central Alberta managed as one build. Either way you get one company accountable from demolition to final walkthrough.
Is the same crew that builds your decks doing my renovation?
Yes. This is the same Green Ladder crew and the same build standards, working inside for the winter season. The difference between a strong build and a weak one is the same whether it is a deck footing or a basement vapour barrier: it is the part you cannot see.
Questions? We answer the phone.
Ready to get started?
Every project starts with a design consultation. We visit your site, design in 3D, and give you a firm proposal before any work begins.
